The STP125 Maintenance Checklist

The Gardner Denver STP125 Maintenance Checklist gives operators and maintenance teams a practical reference for routine inspection and service preparation. 

Rather than waiting for a change in pump performance, maintenance personnel can routinely monitor some of the conditions most closely connected with pump operation: gearcase oil level, seal condition and pumping pressure. 

The checklist also identifies the tools and recommended spare parts to have available when pump-head service is required.

STP125 Pump Maintenance Checklist Cover

Why Weekly Pump Inspections Matter

A pump can continue operating while its condition begins to change.

A small seal leak, changing pressure or incorrect oil level may provide an early indication that maintenance is required. Establishing a weekly inspection routine gives operators a consistent opportunity to identify those changes.

For fleets transporting liquids, that can be particularly important when equipment availability affects loading schedules, deliveries and vehicle utilization. 

What Should Be Checked Weekly on an STP125?

The STP125 weekly maintenance schedule includes four primary areas:

  • Check the oil level in the gearcase
  • Check product seals for leakage and replace as necessary
  • Check oil seals for leakage and replace as necessary at the earliest opportunity
  • Check pumping pressures

These checks should become part of a repeatable maintenance schedule rather than only being performed after a performance problem develops. 

What Does STP125 Seal Leakage Tell You?

Seal leakage deserves particular attention because operating pressure can help determine what the leakage means.

The STP125 is designed for a maximum continuous discharge pressure of 145 psi and can withstand discharge pressures of up to 160 psi intermittently.

At pressures above 145 psi, leakage from the primary seal is possible.

If leakage begins above 145 psi and continues when pressure returns below 145 psi, the primary seal may have been permanently damaged. In that situation, the seal should be replaced at the earliest opportunity.

This makes pressure history valuable when investigating a seal problem. Maintenance personnel should consider not only whether a seal is leaking, but also what pressure conditions occurred when the leakage began. 

STP125

Why Monitor Pressure on Both Sides of the STP125?

The checklist advises installing pressure gauges on both sides of the pump, positioned as close as possible to the ports.

This gives maintenance personnel another way to identify whether an abnormal operating condition may be associated with the pump or the surrounding pipework.

Instead of relying solely on a perceived change in transfer performance, pressure readings provide measurable information that can be compared during troubleshooting.

For fleets establishing a preventive-maintenance program, consistent pressure monitoring can therefore become an important part of understanding normal STP125 operation.

Preparing for STP125 Pump Maintenance

Maintenance planning also means having the correct equipment available before service begins. 

When dismantling the STP125 pump head, the checklist identifies the following tools: 

  • Spanners
  • Socket set
  • Plastic block
  • Soft mallet
  • Cleaning hose
  • Rotor removal tool supplied with the pump
  • 6-inch pry bar

The checklist also recommends retaining commonly required sealing components within the maintenance inventory, including O-rings for the product or mechanical seal, seal housing, sleeve/shaft, sleeve/rotor, rotor nuts and front cover, as well as drive-end and gland-end oil seals. 

The downloadable checklist provides the recommended quantities for each component. 

Remember the STP125 Thermal Hazard

Pressure and leakage are not the only considerations during maintenance.

Under certain operating circumstances, the STP125 can present a thermal hazard. The pump should not be touched during operation.

Following shutdown, allow sufficient time for the pump unit to cool before inspection or maintenance begins.

This is especially important when a technician is responding to a problem immediately after a transfer operation. A maintenance issue may require attention, but that does not eliminate the need to allow the equipment to reach a safe condition first. 

When Does Routine Inspection Become Corrective Maintenance?

Weekly maintenance is intended to identify conditions that require attention, not simply document that an inspection occurred.

A leaking product seal should be addressed as necessary. Oil-seal leakage should be corrected at the earliest opportunity. Abnormal pumping pressures should be investigated rather than treated as normal operation.

Pressure-related primary-seal leakage deserves particular attention. If leakage that began above 145 psi persists after pressure drops below 145 psi, the primary seal may be permanently damaged and should be replaced at the earliest opportunity.

The goal is to use routine inspection to identify the point where normal monitoring needs to become corrective maintenance.

Country

Your request will be forwarded to the relevant individuals to assist with your request.
By clicking 'Send' you are authorizing Gardner Denver to contact you so that we may fulfill your request, as well as to communicate with you regarding our products and services.
Terms and Conditions
Privacy Policy

(* required fields)

This site is protected by reCAPTCHA.

Frequently Asked Questions

The STP125 Maintenance Checklist establishes a weekly schedule for checking gearcase oil level, product seals, oil seals and pumping pressures. 