Totally 7 liquid ring pumps were stopped and replaced by one Runtech Turbo blower and two EP blowers
Stora Enso Skoghall BM8, Sweden vacuum system rebuild fulfills the energy saving target. Totally 7 liquid ring pumps were stopped and replaced by one Runtech Turbo blower and two EP blowers. Power saving in the vacuum system is over 2 000 kW so annually 16,6 GWh. Customer reports also significant savings in water consumption and maintenance costs.
Stora Enso Skoghall BM8 is the biggest primary fibre board machine in Europe, with the width of 8.1 m and annual capacity of 450,000 ton.