gardner_denver_homepage.png

The Brochure

The GD360 Liquid Bulk Package brochure details Gardner Denver’s integrated compressor, pump, and hydraulic cooler system engineered for liquid transfer and bulk hauling transport applications.

At its core, the GD360 Liquid Bulk Package combines:

Compressor + Pump + Hydraulic Cooler = One Integrated System

Designed to simplify installation, improve operator safety, and reduce lifecycle cost, the GD360 eliminates the complexity of traditional multi-component builds. 

Image Brochure GD360

Why It Matters

Traditional liquid bulk systems require:

  • Custom brackets
  • Individual hydraulic hose routing
  • Multi-component mounting
  • Up to 36 hours of installation labor

The GD360 redefines this approach. 

 

With a typical install time of less than 4 hours, fleets can realize:

  • Up to $3,840 labor savings (at $120/hr)
  • 250–300 lbs lighter weight
  • Up to 50% less oil required
  • Reduced installation variability

For transportation & logistics, food & beverage, and chemical transport fleets, that means faster deployment and lower operational risk. 

What You’ll Find Inside

  • Integrated System Engineering
  • Cost-Effective Installation
  • Focus on Safety
  • Simple Operation
  • Hassle-Free Serviceability

Industries Served

  • Transportation & Logistics
  • Food & Beverage
  • Dairy
  • Chemical & Petrochemical
  • Industrial

Application Coverage

  • Liquid Transfer & Bulk Hauling
  • Chemical Transport
  • Food-Grade Liquid Transfer
  • Tank Truck Pressure Offloading

Who Should Download This Brochure

  • Fleet managers standardizing liquid bulk systems
  • Maintenance managers seeking lower install complexity
  • Specifiers aligning pump material compatibility
  • Operators requiring safe, integrated unloading systems

FAQs

The GD360 integrates compressor, pump, and hydraulic cooler into a single bolt-&-go package, reducing installation time and complexity.