Choose a different country or region to see the content specific to your location

{{recommendedRegLangFull}}

Tail threading time reduced by 65% by ropeless RunPro solution - Video

This sack paper/linerboard machine was converted into a ropeless one in three steps, including challenging Clupak area. As a result, operator safety is improved and the tail threading time is down by 65%. Grade changes can be done a lot quicker, as re-routing of the ropes is no longer needed.

  • Safe and efficient operation
  • Average tail threading time dropped from 25 to 5 minutes
  • No unplanned rope change shutdowns. Before installation 3-4 times/month, totally 8-10 hours/month
  • Earlier change from liner to sack paper required re-routing of the ropes
  • Operator safety
  • ROI < 1 year

Read more about ropeless tail threading.

Follow us in LinkedIn.

en-BD